Westport Vinyl Privacy Gate
Westport Vinyl Privacy Gate

Before You Begin

  • Before driving pipe anchors, check for underground utilities. In the US, call 811 or visit www.call811.com. In Canada, visit www.clickbeforeyoudig.com to find your provincial one-call centre. This gate needs two finishing posts (BL19042) driven into the ground.
  • Read your Westport Fence Install Guide first so you understand the fence assembly before installing your gate.
  • Pre-assemble the gate frame as a dry run before driving any permanent screws — confirm every piece fits and the frame goes together in the correct order.
  • Install your gate posts before your fence posts — fence panels are more forgiving for a custom fit than a gate.
  • Never hang a gate off a single unsupported post. See Hinge Post Support below.

Returns: Please let us help resolve any issues before initiating a return. If a return is still necessary, it must be initiated with the retailer where the product was purchased.

Need Help or Replacement Parts?

Our US-based customer service team is available Monday-Friday, 9am-5pm EST.

For faster service, have your item number (BL19106) and part name ready. A batch lot number (found on the end of the box) is also helpful if available — it helps us identify and resolve any production issues on our end.

Finishing Post: BL19042

Gates do not come with their own posts

You will need two Finishing Posts — one to finish the fence run, and one to support the gate.

BL19042 finishing post

Buying Guide

Product Specifications & Dimensions

BL19106 Dimensions and Specifications

Required Tools

Drill with 2in Bit

Tool: Drill with 2in bit

Stringline Reel

Stringline Reel

Stakes (for stringline)

Stakes (for stringline)

Pencil

Pencil

Wrenches

Wrenches

Wood Blocks

Wood Blocks

Small Level

Small Level

Hinge Post Support

Your gate will perform best with complete fence panels on both sides. At minimum, the hinge post should be part of a connected fence run — tying it to a panel that continues to another post lets that post help carry the gate's swinging load, instead of the hinge post bearing it alone. If space restrictions make this impossible, contact us for alternative solutions.

gate should be installed between 2 complete panels

Note on Hinges

Hinges only open one direction. Decide which way you want your gate to open before mounting your hinges.

Hinges open one direction — choose orientation first

Check hinge orientation clears the post before mounting

Part Identification

A

Gate Bracket (4)
BL19106 Part A Gate Bracket

B

1¼in White Self-Drilling Stainless Steel Screw (16)
BL19106 Part B Self-Drilling Screw

C

Rail (2)
1½in × 3½in × 47¾in BL19106 Part C Rail

D

Vertical Stile (2)
1½in × 3½in × 38⅞in BL19106 Part D Vertical Stile

E

Trimmed Board (1)
½in × 9½in × 42⅜in BL19106 Part E Trimmed Board

F

Boards (3)
½in × 12in × 42⅜in BL19106 Part F Boards

G

Hinge (2)
with screws (26) BL19106 Part G Hinge with Fasteners

H

Latch Catch (1)
with screws (6) BL19106 Part H Latch Catch

I

Latch Finger (1)
with screws (6) BL19106 Part I Latch Finger

J

4in Tension Pin (2)
BL19106 Part J Tension Pin

Hinge and latch screws are 1¼in black stainless steel

Step 1: Assemble Bottom of Gate

Parts Required

A x2 C x1

Insert the rail (C) all the way into a bottom gate bracket (A) until it hits the back corner — make sure it's seated against the back of the bracket wall. Press firmly, then repeat for the other side of the gate.

Important: Light force may be required to seat the rail fully.

Insert rail into empty gate bracket

Step 2: Assemble Sides of Gate

Parts Required

D x2

Insert the vertical stiles (D) fully into the bottom gate brackets (A) until they meet the rail.

Insert stiles into bracket against rail

Step 3: Fasten Screws to Brackets

Parts Required

B x8

Fasten using (4) screws (B) per bracket. Apply pressure to make sure your rails and vertical stiles are in place.

fasten using 8 screws

Step 4: Insert Boards

Parts Required

E x1 F x3

Follow the numbers on the diagram. Start with both boards marked 1: slide the trimmed board (E) down into the channel of one vertical stile (D), and one board (F) into the channel of the other. Then fill the middle with the remaining (2) boards (F), marked 2 and 3, locking each one into the board beside it.

Note: Push every board all the way down until it sits in the bottom rail.

Insert boards in numbered order, outer boards first

Step 5: Assemble Top Rail

Parts Required

A x2 C x1

Firmly press a gate bracket (A) onto each end of your remaining rail (C).

Note: Ensure the rail is pushed all the way to the back of the bracket.

Press a gate bracket onto each end of the top rail

Step 6: Insert Top Rail

Parts Required

B x8

Install your pre-assembled top rail onto the gate frame. Fasten using (8) screws (B).

Note: Apply downward force on your top rail while screwing into place, to ensure your frame is square.

Insert top rail and fasten

Step 7: Loosen Hinge Tension (Optional for Slower Self-Closing)

Parts Required

G x2 J x2

For each hinge: insert your tension pin (J) into a hole on top of your hinge (G) and rotate it all the way right — this takes a lot of force. Hold it there, remove the smaller pin, ease the tension pin back left, and place the smaller pin in a new hole.

Loosen hinge tension (optional, for slower self closing)

Top view of optional loosen hinge image

Step 8: Adjust Hinges for Spacing and Level

Using your two wrenches, loosen or tighten the nuts on the hinge to adjust the spacing between your gate and hinge post. This can also help you moderately level your gate later on.

Loosen or tighten nuts to adjust spacing and level

Step 9: Mount Latch Finger and Hinges

Parts Required

I x1 G x2

Fasten the latch finger (I) to the top bracket with (6) screws.

Fasten latch finger

Fasten the hinges (G) to the front of the gate brackets with (8) screws in total.

Fasten gate hinges to front of gate brackets

Step 10: Fasten Hinges to Post

Place wooden blocks under your gate to ensure it is level with your fence rails. Fasten the hinges to the post with (6) screws in total, (3) per hinge.

Closed gate resting level on wood blocks

Fasten hinges to post

Step 11: Secure Hinges from the Inside

Open your gate — making sure to set it on the two wooden blocks to keep it level. Fasten each hinge with (6) black screws — (4) into the post and (2) into the gate frame.

Open gate resting level on wood blocks

Drive 4 screws through each hinge into the post

Drive 2 screws through each hinge into the gate frame

Step 12: Level Your Gate

Level the gate to the fence post by adjusting the nuts on the hinges. Check the gate to make sure it functions correctly. Mark where you need to install your latch catch.

Level gate to the fence post by adjusting nuts on hinges

Step 13: Install Latch Catch

Parts Required

H x1

Fasten the latch catch (H) with (6) screws.

Fasten latch catch, first side

Fasten latch catch, completed