All American Flat Top Vinyl Fence Kit with No-Dig Post
All American Flat Top Picket Fence

Before You Begin

  • Call 811 before you dig to check for underground utilities.
  • Build one complete panel first, then drive all remaining pipes, attach posts, and build out from there.
  • If your yard slope exceeds 3–4" per 6' panel, you will need to split your panels and purchase an extra post and brackets.

Returns: Please let us help resolve any issues before initiating a return. If a return is still necessary, it must be initiated with the retailer where the product was purchased.

Need Help or Replacement Parts?

Our US-based customer service team is available Monday-Friday, 9am-5pm EST.

For faster service, have your item number (ZP19084) and part name ready. Your original product box is also helpful if available.

Finishing Post: ZP19046

Your panel comes with 1 post/anchor kit.

You will need 1 ZP19046 to finish the fence run. If you are installing a gate (ZP19085), you will need two finishing posts — one to finish the run, and one to support the gate.

ZP19084 Finishing Post ZP19046

Buying Guide

Product Specifications & Dimensions

ZP19084 Dimensions and Specifications

Required Tools

Drill with 2" Bit Drill

Pencil Pencil

Measuring Tape Measuring Tape

Stringline Reel Stringline Reel

Stakes (for stringline) Stakes

Hammer / Mallet (for stakes) Hammer or Mallet

Wood Block Wood Block

1 ft Level 1 ft Level

Post Pounder Considerations

Good

Good: Sledge Hammer 10-15lbs Sledgehammer
10-15lbs.
A basic option for very small projects. Requires two people to keep pipes level during installation.

Better

Better: Manual Post Pounder Manual Post Pounder
12-30lbs.
Best for projects with fewer than 10 pipes. Available online or at hardware stores.

Best

Best: Gas Powered Pounder Gas Powered Pounder
Rentals are ideal for larger projects. Significantly reduces time and effort required.

Tip!

Don't use a 5lb sledgehammer — it won't generate enough force to be effective, and driving the pipe turns into a slow, frustrating grind.

Practice Makes Perfect

Start with one full panel — it's the best way to learn the process. Once complete, drive your next pipe anchor and build each remaining panel one at a time.

Important: Call 811 before you start driving your pipes!

Call 811 before you dig

Part Identification

A

Pipe Anchor (1)
1⅝" Diameter x 44⅞" L ZP19084 Part A Pipe Anchor

B

Post (1)
2" x 3½" x 44⅝" ZP19084 Part B Post

C

Bracket (4) ZP19084 Part C Bracket

D

Bottom Rail (1)
1½" x 3½" x 68¼" ZP19084 Part D Bottom Rail

E

Top Rail (1)
1½" x 3½" x 68¼" ZP19084 Part E Top Rail

F

Picket (12)
⅜" x 2¾" x 40" ZP19084 Part F Picket

G

1" Self-Drilling Stainless Steel Screw (24) ZP19084 Part G Screw

H

Post Cap (1) ZP19084 Part H Post Cap

Step 1: Determine Slope

Check your yard's slope early. If slope is greater than 3–4" per 6', you will need to split panels and purchase an extra post & brackets. ZP19084 Step 1: determine slope

Step 2: Set Stringline

Place two stakes at each end of every fence run and tie string between them. Your pipes will be driven according to this line. Need help? Watch this video. ZP19084 Step 2: set stringline between stakes

Step 3: Mark Pipe Locations

Use loose stakes or mark the ground every 72" to determine exact pipe locations, measuring center-to-center. ZP19084 Step 3: mark pipe locations every 72 inches

Step 4: Drive Pipe Into Ground

Parts Required

A x1

Drive your first Pipe Anchor (A) into the ground. The bottom of the plastic ring should sit just above the ground when finished. ZP19084 Step 4: drive first pipe anchor into ground

Step 5: Install Pipes

Parts Required

A x1

Check for level roughly every 6 inches. To help maintain level, pound the pipe equally from all 4 sides. Center of pipe to center of pipe: 72". ZP19084 Step 5: install second pipe anchor

Step 6: Install Posts

Parts Required

B x1

Install Post (B) over your pipe, ensuring the tab is at the top. Using a wood block, pound the post so the bottom 3–4" is below ground. Repeat for the second post. ZP19084 Step 6: install post over pipe anchor

Step 7: Secure Posts

Parts Required

B x1

Optional: secure the post to the pipe anchor with (2) 1" self-drilling hex head steel screws (not included). This is worth doing if you're concerned about posts being pulled out of the ground — otherwise, move on to Step 8. ZP19084 Step 7: optional post-to-pipe-anchor screw

Step 8: Bracket Installation

Parts Required

C x1 G x4

Install one Rail Bracket (C) on the first post, approximately 2" off the ground, using four 1" Self-Drilling Stainless Steel Screws (G). ZP19084 Step 8: install first rail bracket 2in off ground

Step 9: Bracket Alignment

Parts Required

C x1 D x1

Slide the second Rail Bracket (C) over the opposite end of the Bottom Rail (D) and rest the rail into the bracket installed in Step 8. Adjust the post by sliding it left or right until the rail fits, then mark the bracket height on the post and temporarily remove the rail. ZP19084 Step 9: align second bracket via bottom rail

Step 10: Bracket Installation (Second Post)

Parts Required

C x1 G x4

Using your marked location, secure the Rail Bracket (C) to the second post with four 1" Self-Drilling Stainless Steel Screws (G).

Important Note:

Installing brackets at a 90° angle? Mark the four hole locations on the post and pre-drill using a ⅛" drill bit for steel (not included), then secure with the same four screws. ZP19084 Step 10: install second bracket at marked height

Step 11: Bottom Rail Install

Parts Required

D x1 G x4

Secure bottom rail (D) into brackets with four 1" self-drilling stainless steel screws (G). ZP19084 Step 11: secure bottom rail into brackets

Step 12: Top Bracket Installation

Parts Required

C x2 G x8

Measure 27" up from the top face of the bottom rail and mark the position for the top rail brackets on both posts. Install one Rail Bracket (C) on each post using four 1" Self-Drilling Stainless Steel Screws (G), confirming the top and bottom brackets are aligned to properly position the rail. ZP19084 Step 12: measure 27in and secure top brackets

Step 13: Top Rail Install

Parts Required

E x1 G x4

Secure the Top Rail (E) into both brackets with four 1" Self-Drilling Stainless Steel Screws (G).

Important Note:

The top rail has picket holes on both sides; the bottom rail has holes on one side only. ZP19084 Step 13: secure top rail into both brackets

Step 14: Picket Installation

Parts Required

F x12

Insert all 12 Pickets (F) through the top rail, pushing each one down until it locks into the bottom rail. ZP19084 Step 14: insert pickets through the top rail

Step 15: Post Caps

Parts Required

H x1

Press the Post Cap (H) firmly onto your post until it locks in place. For a permanent hold, secure with PVC glue (not included). ZP19084 Step 15: install post caps

Need Help?

We Are Part of
Site Logo
Visit Our Websites
Privacy Notice ©2024-Nych Brands Inc. or its affiliates