Edgewood 6ft Privacy Fence
Before You Begin
- Before driving pipe anchors, check for underground utilities. In the US, call 811 or visit www.call811.com. In Canada, visit www.clickbeforeyoudig.com to find your provincial one-call centre.
- If installing surface mounted, refer to your Surface Mount install guide (BL19129/BL19130) for specific instructions instead of the steps below.
- If your yard slope exceeds 3–4in per 6ft panel, you will need to split your panel and purchase an extra post and set of brackets.
- This panel does not include posts. See the Posts section below to order your post kits.
Returns: Please let us help resolve any issues before initiating a return. If a return is still necessary, it must be initiated with the retailer where the product was purchased.
Need Help or Replacement Parts?
Our US-based customer service team is available Monday–Friday, 9am–5pm EST.
- Parts Website: https://parts.nychbrands.com/
- Email: hmmm@wambamfence.com
- Phone: 704-892-5222 or 877-778-5733
- Text: 704-892-5222
For faster service, have your item number (BL19113/BL19114/BL19133) and part name ready. A batch lot number (found on the end of the box) is also helpful if available — it helps us identify and resolve any production issues on our end.
Posts: BL19125/BL19126
Buying Guide
6ft Edgewood Privacy Fence Walnut Brown/Slate Grey/Black, 6ft Edgewood Gate Walnut Brown/Slate Grey/Black, and 6ft Black Aluminum Post 1 pack/4 pack
Product Specifications & Dimensions
Important: Know What's Underground
Important: Check for underground utilities before you start driving your pipes!
In the US, call 811 or visit www.call811.com. In Canada, visit www.clickbeforeyoudig.com to find your provincial one-call centre.
Post Pounder Considerations
Pounders can be purchased/rented at your local hardware store, or on our website. For safety reasons, we do not recommend using a sledgehammer.
Good
Small Post Pounder
12–18 lbs.
Best for projects with fewer than 10 pipes.
Better
Large Post Pounder
20+ lbs.
Best for 10+ pipes, and may require two people for smoothest operation.
Best
Gas Powered Post Pounder
Rentals are ideal for larger projects. Significantly reduces time and effort required.
Note:
Choose a post pounder with a barrel diameter of 3in or greater. Pounder barrel cannot be longer than 24in.
Required Tools
Pounder
Drill Bit
Measuring Tape
Minimum 2in Drill Bit
(included in box)
Hex Bit
(included in box)
Stringline Reel
Stakes (for stringline)
Hammer / Mallet (optional, for stakes)
Pencil
Safety Glasses
Large Level
Small Level
Part Identification
A
Rail Bracket (4)
B
Rail (2)
¾in x 2in x 69¼in
C
Privacy Board (5)
⅝in x 13⅞in x 69in
Boards contain galvanized steel inserts
D
C-Channel (2)
1⅛in x 1¼in x 66⅜in
E
½in Hex Screw (20)
Includes a few extra screws.
F
½in Self-Drilling Screw (6)
Includes a few extra screws
Post Parts (BL19125/BL19126, Sold Separately)
P1
Post Cap (1)
P2
Pipe (1)
2½in x 2½in x 74½in
P3
Post (1)
2½in x 2½in x 75in
Install Methods
Option A
In Ground
Build one full panel first — there is a learning curve. After one panel is installed, it is most efficient to drive all remaining pipes, then build panels onto the posts.
Step 1: Determine Slope
Check your yard's slope before you begin.
If slope is greater than 3–4in per 6ft panel, you will need to split your panel and purchase an extra post and set of brackets.
Step 2: Set Stringline
Place the two stakes for each end of every fence run and tie string between the stakes. Your pipes will be driven according to this line.
Step 3: Mark Pipe Locations
Use loose stakes or mark the ground every 72in to determine exact pipe locations, measuring center-to-center.
Step 4: Tighten Donuts
Parts Required
P2 x1
Warning: Before you install your fence, ensure your donuts are tightened. Do not overtighten.
Step 5: Install Pipes
Parts Required
P2 x1
Drive your pipe into the ground. Check for level roughly every 6in. To help maintain level, pound the pipe equally from all four sides until the lower gear touches the ground. Check that the pipe is level front-to-back and left-to-right. Center of pipe to center of pipe: 72in.
Step 6: Install Posts
Parts Required
P3 x1
Place your post over your pipe.
Step 7a: Set Brackets on Slopes
Parts Required
A x1 E x2
If your posts are on flat ground, proceed to Step 8.
If your ground is sloped, identify the post that is on higher ground. Secure your bracket as close to the ground as possible against the higher post. Use your rail to ensure the bracket on the lower elevation post is level with the first bracket.
Step 7b: Install First Bracket
Parts Required
A x1 E x2
Set your bracket within the grooves on your post. Measure 2in from the ground and mark your first post — or stack your two brackets together to mark it instead. Secure the bracket with two ½in hex screws (E) using the included hex bit.
Step 8: Mark Second Bracket
Parts Required
A x1 B x1
Without driving screws, place a rail bracket over the bottom rail. Using a level, mark the location of the second bracket, then remove the rail.
Step 9: Install Second Bracket
Parts Required
A x1 E x2
Install the bracket to the post at your marked location using two ½in hex screws (E).
Step 10: Install Bottom Rail
Parts Required
B x1 E x4
Secure the bottom rail (B) into both brackets using four ½in hex screws (E).
Note: Ensure the bottom bracket is flush with the rail.
Step 11: Install C-Channels
Parts Required
D x2 F x6
Important: Before this step, swap out the hex head drill bit for the Phillips bit included in the bag for part (F). Keep the hex bit close — you'll resume using it shortly.
Align your C-Channel (D) over your bottom bracket. Secure each C-Channel with three ½in self-drilling Phillips screws (F) (six total). The Phillips screws are self-drilling and can drive through aluminum with pressure; a drill bit is also included in the screw bag for part (F).
Step 12: Install Top Brackets
Parts Required
A x2 E x4
Align your top brackets (A) over your C-Channels and secure with four ½in hex screws (E).
Step 13: Install Boards
Parts Required
C x5
Install your five boards (C) by sliding them down through the top bracket and C-Channel. Ensure the notch is facing upward. Posts may need to be pushed out slightly at the top to insert the boards.
Step 14: Install Top Rail
Parts Required
B x1 E x4
Ensure the rail goes to the back of the bracket. Apply downward force and secure with four ½in hex screws (E).
Step 15: Install Post Caps
Parts Required
P1 x1
If needed, trim your posts with a fine-tooth blade, then place post caps (P1) on the posts to finish your panel.